內頁banner
Contact us
  • KITSEN Formwork and Scaffolding Technology Co.,Ltd., Fengwei Shan, Beiguan Town, Yangjiang, Guangdong, China.

  • zip code :

    529932
  • phone :

    86-662-6698891/6699126
  • Fax :

    86-662-6698891
  • Email :

    [email protected]
Products

loading images
Quick Early-stripping Slab Formwork - Fastform

Quick Early-stripping Slab Formwork - Fastform

  • Payment :

    T/T 30% deposit payment before manufacture, and 70% balanced payment against B/L Copy.
  • original region :

    China
  • port of dispatch :

    Shenzhen, China
  • min order :

    Containers
  • Early-stripping Slab Formwork for concreting of constructions comprising beams, slab and columns comprises several rectangular standard formworks, props with multiple early-stripping support mechanisms , several filler beams and filler panels.

inquiry now
description


1. Product Description:

KITSEN Early-stripping Slab Formwork is an advanced aluminum panel-prop-formwork system which allows early stripping operation.


2. Product Parameters:

1) Product Name: Kitsen Fastform System

2) Material: Aluminum Alloy 6061-T6, Birch Plywood

3) Specification(mm) of Panel: 1800×1200mm (various size for selecting)

4) Specification(mm) of Filler Beam: 1800/1200/900/600mm (various size for selecting)

5) Specification(mm) of Truss: 1800×600mm (various size for selecting)

6) Basic Components: Panel, Filler Beam, Crown, prop, Lock Pin, Truss, Guardrail Post, 7) Disassembly Tool, Cantilever Support Brace, With Transverse Beam,

8) Fastform Formwork Height: No Restriction, Can be adjusted by Changing the Prop


3. Product Details:














4. Advantages:

1) Fast &Efficient

- Modular components, beam and panel are made of aluminum which is light enough to erect, strip and disassemble.

- One worker can assemble 27m2 per hour, and dismantle 54 m2 per hour.

- Allowable concrete thickness ≤300mm.

- Birch plywood thickness:10mm.

2) Safe&Reliable-Stable system with 6-direction locking restrictions

3) Simple-Only three basic components: panel, crown, prop



5. Product Assembly Description:

1) Check that all components are on site, undamaged and that they are functioning correctly – (refer to Checklist and Quantity Schedules).

2) Damaged or incorrect components shall not be used.

3Make sure the panel is clean before assembly.

4) Handle panels with care during transit, avoid bumping and collision.

5) Do not hit, pry and drop panels roughly when stripping.

6) Assort and pile up panels properly. Handle panels with care.

7) Keep in mind that the maximum safe working load capacity is 13.75KN/ m2 per square meter.





Leave a Message

If You Have Any Questions Or Inquiries Please Call Us Or Email Us By Sending a Message.

Copyright ? 2017 Kitsen Formwork And Scaffolding Technology Co.,Ltd. All Rights Reserved.粵ICP備07503178

Sitemap XML

leave a message

KITSEN

   

the professional team to service !

东方6十1最新开奖号码 鄂尔多斯市福彩中心官方 六合彩特码 pk10赛车规律图 最新手机游戏搬砖赚钱 时时彩官网 辽宁彩票网 体彩超级大乐透 沈阳现在什么兼职赚钱 福建31选7开奖号码 宁夏十一选五 一定牛 上海时时彩开彩结果 广西快乐双彩复式多少钱 进十三行赚钱 内蒙古快三走势图今天 女人丝袜脚就可以赚钱 电脑单机麻将游戏大全